Tuesday, March 30, 2010

Downstairs Bathroom Re-Model

It's been sippy-sailing for me since last week!!! No more bottles for this big boy :-) He's gonna eat us out of house and home if he keeps eating like he has been -- I couldn't believe how much he ate over the weekend -- but it's good to see him eating table food (he refuses to eat fresh fruit -- must be a texture thing -- so I still mash it for him so that he gets some in his diet). The pic below is gross because of the food in his mouth, but you can kind of see his top teeth pushing through the gums -- his top left came through Saturday and I think his top right will be the next tooth he gets.
Sunday early afternoon Jim found the downstairs toilet leaking and that led to quick, impromptu bathroom remodel. So he went to the hardware store to get some new seals for the toilet and we spent the day stripping the wall paper border (it took forever to get that darn stuff down -- I would like to have a good talkin' w/ the person who developed the glue for wall paper). Jim got the paper down and filled in the holes from hangy thingies and I got the glue down on Sunday -- then Monday I spackled and sanded behind the sink and where the toilet tank had been (they used a flat paint last time so there was some water damage) and Jim painted the ceiling. So today we are hoping to get the walls painted and finish this project off -- 3 days with work and a toddler around, I don't think that's too bad for a project!
ABOVE :: pre-painting

2 comments:

  1. Oooooh, I could just look at pictures of James for days! He's such a cutie with a great smile! Please enter him into some contest so I can vote! ;)
    Good luck with the bathroom. Make good use of the PLAY in Pack n Play!

    ReplyDelete
  2. Thanks, Sheryl! If you find a good contest w/ a good reputation, let me know...college scholarships are definitely welcome :-)

    ReplyDelete